Bradford’s City Hall required essential rewiring, and as part of that project LITE Ltd was commissioned to replace the original inefficient floodlighting on the clock tower with energy-saving LEDs.
Bradford’s City Hall required essential rewiring, and as part of that project LITE Ltd was commissioned to replace the original inefficient floodlighting on the clock tower with energy-saving LEDs.
Project Credits: Philips, Balfour Beatty, and LITE Ltd
Photos: © LITE Ltd
Pharos Architectural Controls Limited
International House
7 High Street
Ealing Broadway
London W5 5DB
United Kingdom
+44 (0)20 7471 9449