The original church built in 1828 was revamped in February 2018, with the brief for a cost-effective and efficient lighting installation that is easy to install and that will create an inviting environment both on the inside and out
The original church built in 1828 was revamped in February 2018, with the brief for a cost-effective and efficient lighting installation that is easy to install and that will create an inviting environment both on the inside and out
Project Credits: Acclaim Lighting
Photos: © EPS Lighting
Pharos Architectural Controls Limited
International House
7 High Street
Ealing Broadway
London W5 5DB
United Kingdom
+44 (0)20 7471 9449